Universal Access To All Knowledge
Home Donate | Store | Blog | FAQ | Jobs | Volunteer Positions | Contact | Bios | Forums | Projects | Terms, Privacy, & Copyright
Search: Advanced Search
Anonymous User (login or join us)
Upload
Search Results
Results: 1 through 3 of 3 (0.003 secs)
You searched for: mediatype:texts AND collection:PresidioTrustLibrary AND subject:"Water Recycling Project"
[texts]Draft Final Completion Report Phase I Interim Action Building 1065 Corrective Action Plan Area Presidio of San Francisco, California - MACTEC Engineering and Consulting, Inc.
This Completion Report describes field activities and results of final confirmation sampling for a soil excavation program that was conducted at the Building 1065 Corrective Action Plan Area, Presidio of San Francisco, California as part of a Phase I Interim Action (IA). The Phase I IA was performed to reduce exposure to construction workers and implement cleanup prior to construction of the Presidio Trust√Ęs Water Recycling Project at the Building 1065 CAP Area.
Keywords: environmental remediation; Building 1065; Building 1065 Area; soil contamination; soil excavation; soil removal; groundwater contamination; petroleum contamination; Water Recycling Project
Downloads: 882
[texts]Final Corrective Action Implementation Work Plan Building 1065 Area, Presidio of San Francisco, California - MACTEC Engineering and Consulting, Inc.
This Corrective Action Implementation Work Plan has been prepared to implement the corrective actions identified in the Final Corrective Action Plan Building 1065 Area to address soil and groundwater contamination at the Building 1065 Area, Presidio of San Francisco, California. The activities described in this Work Plan identify the fieldwork components of implementing the corrective actions to address soil and groundwater contamination that is related to or co-located with releases of petroleu...
Keywords: environmental remediation; Building 1065; Building 1065 Area; Building 1063; soil contamination; groundwater contamination; petroleum contamination; Implemenation Work Plan; Water Recycling Project; historic preservation; soil excavation; soil removal; groundwater monitoring; land use controls; indoor air assessment; indoor cap assessment; outdoor cap assessment
Downloads: 8
[texts]Final Corrective Action Plan Building 1065 Area Presidio of San Francisco, California - MACTEC Engineering and Consulting, Inc.
This Corrective Action Plan (CAP) has been prepared to evaluate and select corrective action alternatives to address soil and groundwater contamination at the Building 1065 Area, Presidio of San Francisco, California. This CAP addresses contamination that is related to or co-located with releases of petroleum hydrocarbons from past use of the site. Remedial actions selected will be those that are protective of human health, the environment, and groundwater quality, are cost-effective, allow reus...
Keywords: environmental remediation; Building 1065; Building 1065 Area; Building 1063; soil contamination; groundwater contamination; petroleum contamination; Corrective Action Plan; Water Recycling Project; historic preservation; history; soil excavation; soil removal; groundwater monitoring; land use controls; indoor air assessment; indoor cap assessment; outdoor cap assessment; freshwater ecological protection zone
Downloads: 1,630
Advanced search

Group results by:

> Relevance
Mediatype
Collection

Refine your search:

File formats
MP3 files
Any audio file
Movie files
Images

Related collections

PresidioTrustLibrary

Related mediatypes

texts